Project foundations
Merged
- Swift/SwiftUI modular project, strict concurrency, CI, linting
Implemented in the development code. Final release verification is tracked in #115.
Issue 1Plan reference E00
1 of 7 merged
Build foundations, migration, updates, signed candidates, final evidence and the public release.
One of the five chapters on the way to 1.0: 1 of its 7 work areas are merged into the development code, which is not the same as verified for release. Checked against the development repository on 15 October 2026.
1.0 isn’t a date; it’s a set of checks. This chapter is how a build becomes a release you can trust: a stabilisation gate, a private signed candidate tested on a real Mac, final localisation and an interface freeze, a final signed candidate with its source and licence evidence, the same checks repeated on those exact files, and only then the public release.
Each step guards the next. If anything that goes into the app changes after the final candidate, verification starts again. The matching source archives are published before the final build, so its licence notices can point at them.
The project foundations are done. The source-only v0.1.0-alpha.1 testing prerelease exists, but it doesn’t count towards these steps, and no date is promised for 1.0.
From the acceptance criteria in the plan. Merged work still has to pass these on a release build.
Merged
Implemented in the development code. Final release verification is tracked in #115.
Issue 1Plan reference E00
Still required
Depends on Mac integration and personalisation; HTML preview and export safety; Contributions, anchors and math correctness; File, settings and native hardening; Release-side software before UI freeze.
Still required
A private verification build is a step toward release, not a public download.
Depends on Software and UI stabilisation gate.
Still required
This step publishes corresponding source archives only; it does not publish the application.
Depends on MacDown 2 → MostlyText: brand and identity crossover.
Issue 148Plan reference sources
Still required
Depends on Final localisation and string freeze; Corresponding-source publication.
Still required
Follows the 9 October two-candidate sequence, which supersedes the earlier ordering.
Depends on Final signed candidate and compliance.
Issue 115Plan reference gate115
Still required
No date is promised for stable 1.0. The source-only v0.1.0-alpha.1 testing prerelease is available; it does not complete the 1.0 release requirements.
Depends on Final repository cutover.
Issue 18Plan reference release